ENOC Group announced on December 4, 2024, the successful completion of its Horizon Jebel Ali Pipeline Upgrade Terminal (JPUT) project in Singapore, marking a significant step in its global expansion strategy.
Key Features of the Pipeline Connection
The project involves connecting two key storage terminals via two pipelines:
- A 24-inch pipeline dedicated to fuel oil.
- A 20-inch pipeline for clean petroleum products.
This infrastructure upgrade improves operational efficiency, reduces costs for clients, and enhances overall safety in maritime transport.
Since operations commenced in January 2024, the new pipelines have:
- Cut transport times between storage sites.
- Lowered operational costs significantly.
- Enhanced environmental sustainability by reducing carbon emissions associated with transportation.
Strategic Importance
This project is part of ENOC’s broader strategy to strengthen its presence in the Asia-Pacific region. The enhanced capabilities at the Singapore terminals are expected to boost regional trade and provide more efficient services to ENOC’s growing client base. Additionally, the group aims to support global energy demands while adhering to its sustainability goals.